You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
docuseal/docs/backlog/QUICKSTART.md

4.2 KiB

Quick Start Guide - FloDoc Stories Presentation

🚀 Quick Launch

NEW: Interactive Kanban Board (BEST CHOICE)

Option 1: Open Kanban Board

# Navigate to the backlog directory
cd docs/backlog

# Open the Kanban board
xdg-open stories-kanban.html

# Or on macOS
open stories-kanban.html

Option 2: Serve Kanban Board

cd docs/backlog
python3 -m http.server 8000
# Then open: http://localhost:8000/stories-kanban.html

Enhanced Viewer with Navigation Panel

Option 3: Open Enhanced Viewer

cd docs/backlog
xdg-open stories-viewer-enhanced.html

Option 4: Serve Enhanced Viewer

python3 -m http.server 8000
# Then open: http://localhost:8000/stories-viewer-enhanced.html

Alternative: Original Full-Screen Presentation

Option 5: Open Original Presentation

cd docs/backlog
xdg-open stories-presentation.html

Option 6: Serve Original Presentation

python3 -m http.server 8000
# Then open: http://localhost:8000/stories-presentation.html

Quick Reference

Option 7: Just Read the Summary

cat docs/backlog/STORIES_SUMMARY.md
# or
less docs/backlog/STORIES_SUMMARY.md

📊 What You'll See

Presentation Website (stories-presentation.html)

  • 42 full-viewport slides - one per user story
  • Professional design with gradient background
  • Keyboard navigation - Arrow keys or Space
  • Progress bar - Shows completion percentage
  • Clean layout - User Story, Background, Acceptance Criteria per slide

Summary Document (STORIES_SUMMARY.md)

  • Quick reference with all 42 stories
  • User stories only - Easy to scan
  • Markdown format - Works in any editor

🎯 Navigation Controls

Action Keyboard Mouse
Next slide or Space Click "Next" button
Previous slide Click "Previous" button
First/Last - Use buttons

📋 Story Breakdown

Phase Stories Focus
1. Foundation 3 Database & Models
2. Backend Logic 8 Workflows & Business Logic
3. API Layer 4 REST APIs & Webhooks
4. Admin Portal 10 TP/TP Portal UI
5. Student Portal 5 Student-facing UI
6. Sponsor Portal 2 Sponsor-facing UI
7. Testing & QA 5 Quality assurance
8. Infrastructure 4 Deployment & Docs

Total: 42 stories

⏱️ Time Estimates

Each story is designed for 4-hour implementation windows:

  • Small stories: 1-2 hours
  • Medium stories: 3-4 hours
  • Large stories: 4+ hours (may need splitting)

🔄 Regeneration

If the source document changes:

cd docs/backlog
python3 generate_presentation.py

This will regenerate both stories-presentation.html and STORIES_SUMMARY.md.

📁 Files in This Directory

docs/backlog/
├── README.md                    # This overview
├── QUICKSTART.md               # This quick start guide
├── stories-presentation.html   # The presentation (118KB)
├── STORIES_SUMMARY.md          # Quick reference (11KB)
└── generate_presentation.py    # Regeneration script (14KB)

🎯 Next Steps

  1. Review all stories in the presentation
  2. Prioritize stories for Sprint 1
  3. Create branches following BMAD workflow
  4. Implement with QA gates
  5. Merge to master after approval

💡 Pro Tips

  • Use full-screen mode in your browser for best experience
  • Bookmark the presentation for quick access
  • Print STORIES_SUMMARY.md for team meetings
  • Share the HTML file with stakeholders for review

🐛 Troubleshooting

HTML won't open?

  • Ensure file extension is .html
  • Try a different browser
  • Check file permissions: chmod 644 stories-presentation.html

Content looks wrong?

  • Regenerate: python3 generate_presentation.py
  • Check source: cat ../prd/6-epic-details.md | head -100

Want to see a specific story?

  • Use Ctrl+F in the summary document
  • Navigate to slide number in presentation

Generated: 2026-01-15 Source: docs/prd/6-epic-details.md (832KB) Stories: 42 Total Time Estimate: ~168 hours (42 stories × 4 hours)