You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
docuseal/docs/PO_Validation_Summary.md

3.3 KiB

PO Validation Summary - FloDoc v3 PRD

Date: 2026-01-13 Decision: ⚠️ CONDITIONAL APPROVAL (85% Ready) Full Report: docs/PO_Master_Validation_Report.md


🎯 Quick Decision

Can development proceed? YES, but with 3 blocking conditions first

What's good:

  • Complete 32 stories across 8 phases
  • All 24 functional requirements covered
  • Brownfield integration approach defined
  • Local Docker infrastructure ready
  • Rollback procedures for every story

What's blocking:

  • 🔴 Production deployment undefined
  • 🔴 Security audit methodology missing
  • 🔴 User communication/training plan missing

🔴 3 Blocking Issues (Must Fix First)

1. Production Deployment Strategy

Problem: Stories 8.1-8.4 deferred, no production path defined Fix: Choose one:

  • Add production stories to PRD
  • Declare "Local Docker MVP only"
  • Add minimal Story 8.1

2. Security Audit Checklist

Problem: Story 7.4 mentions security but has no checklist Fix: Add to Story 7.4:

  • OWASP Top 10 verification
  • Authentication flow audit
  • POPIA compliance review
  • Penetration testing scope

3. User Communication Plan

Problem: No plan for existing DocuSeal users Fix: Add Story 8.5:

  • Migration announcement email
  • TP/Student/Sponsor help guides
  • Training materials
  • FAQ

⚠️ 5 High-Priority Issues (Should Fix)

  1. Feature flags - No toggle mechanism
  2. API contracts - No request/response examples
  3. User documentation - No help guides
  4. Knowledge transfer - No ops team plan
  5. Monitoring - No analytics/feedback

What Can Proceed Immediately

Stories 1.1-8.0.1 are APPROVED:

  • Epic 1: Foundation (3 stories)
  • Epic 2: Core Logic (8 stories)
  • Epic 3: API (4 stories)
  • Epic 4: TP Portal (4 stories)
  • Epic 5: Student Portal (4 stories)
  • Epic 6: Sponsor Portal (2 stories)
  • Epic 7: Testing (5 stories)
  • Epic 8: Local Infrastructure (2 stories)

Total: 32 stories ready for implementation


📋 Next Steps

For You (PO):

  1. Address the 3 blocking issues above
  2. Update docs/prd.md with fixes
  3. Run validation again: *execute-checklist-po @docs/prd.md
  4. Give final approval to proceed

For Dev Agent:

  1. Wait for your signal
  2. Implement stories 1.1-8.0.1 in order
  3. Follow BMAD 4.6 structure
  4. Reference design system in .claude/skills/frontend-design/

📊 Metrics

Category Status Issues
Project Setup Approved 0
Infrastructure ⚠️ Conditional 2
Dependencies ⚠️ Conditional 1
UI/UX Approved 0
Responsibilities Approved 0
Sequencing Approved 0
Risk Mgmt ⚠️ Conditional 3
MVP Scope Approved 0
Documentation ⚠️ Conditional 3
Post-MVP ⚠️ Conditional 4

Total: 15 issues (3 blocking, 12 high/medium)


💡 Recommendation

Approve with conditions:

  1. Fix 3 blocking issues
  2. Update PRD
  3. Re-validate
  4. Then proceed with implementation

The PRD is excellent quality - just needs production readiness details.


Full analysis available in: docs/PO_Master_Validation_Report.md (27KB)

Questions? Ask me to help draft any of the missing stories or checklists.