## 5.1 EPIC APPROACH
|
|
|
|
**Epic Structure Decision**: **Single Comprehensive Epic** with rationale
|
|
|
|
**Rationale for Single Epic Structure:**
|
|
|
|
Based on my analysis of the existing DocuSeal + FloDoc architecture, this enhancement should be structured as a **single comprehensive epic** because:
|
|
|
|
1. **Tightly Coupled Workflow**: The 3-portal cohort management system is a single, cohesive workflow where:
|
|
- TP Portal creates cohorts and initiates signing
|
|
- Student Portal handles enrollment and document submission
|
|
- Sponsor Portal completes the 3-party signature workflow
|
|
- All three portals must work together for the workflow to function
|
|
|
|
2. **Sequential Dependencies**: Stories have clear dependencies:
|
|
- Database models must exist before any portal can be built
|
|
- Core workflow logic must be in place before UI can be tested
|
|
- Integration points must be validated before end-to-end testing
|
|
|
|
3. **Shared Infrastructure**: All portals share:
|
|
- Same database models (Cohort, CohortEnrollment, Institution)
|
|
- Same authentication/authorization patterns
|
|
- Same DocuSeal integration layer
|
|
- Same design system and UI components
|
|
|
|
4. **Brownfield Context**: This is an enhancement to existing DocuSeal functionality, not independent features. The integration with existing templates, submissions, and submitters must be maintained throughout.
|
|
|
|
**Alternative Considered**: Multiple epics (e.g., "TP Portal Epic", "Student Portal Epic", "Sponsor Portal Epic")
|
|
- **Rejected Because**: Creates artificial separation. Each portal is useless without the others. The workflow is atomic.
|
|
|
|
**Epic Goal**: Transform DocuSeal into a specialized 3-portal cohort management system for training institutions while maintaining 100% backward compatibility with existing functionality.
|
|
|
|
## 5.2 STORY SEQUENCING STRATEGY
|
|
|
|
**Critical Principles for Brownfield Development:**
|
|
|
|
1. **Zero Regression**: Every story must verify existing DocuSeal functionality still works
|
|
2. **Incremental Integration**: Each story delivers value while maintaining system integrity
|
|
3. **Risk-First Approach**: Prototype high-risk items early (TP signing duplication, sponsor email deduplication)
|
|
4. **Test-Driven**: All stories include integration verification steps
|
|
5. **Rollback Ready**: Each story must be reversible without data loss
|
|
|
|
**Story Sequence Overview:**
|
|
|
|
```
|
|
Phase 1: Foundation (Database + Core Models)
|
|
├── Story 1.1: Database Schema Extension
|
|
├── Story 1.2: Core Models Implementation
|
|
└── Story 1.3: Authorization Layer Extension
|
|
|
|
Phase 2: Backend Business Logic
|
|
├── Story 2.1: Cohort Lifecycle Service
|
|
├── Story 2.2: TP Signing Phase Logic (High Risk - Prototype First)
|
|
├── Story 2.3: Sponsor Email Deduplication (High Risk - Core Requirement)
|
|
├── Story 2.4: Student Enrollment Workflow
|
|
├── Story 2.5: Sponsor Portal Access Management
|
|
├── Story 2.6: TP Review & Verification Logic
|
|
├── Story 2.7: Bulk Download & ZIP Generation
|
|
└── Story 2.8: Excel Export (FR23)
|
|
|
|
Phase 3: API Layer
|
|
├── Story 3.1: Cohort Management Endpoints
|
|
├── Story 3.2: Student Portal API Endpoints
|
|
├── Story 3.3: Sponsor Portal API Endpoints
|
|
└── Story 3.4: Excel Export API
|
|
|
|
Phase 4: Frontend - TP Portal
|
|
├── Story 4.1: Institution Onboarding UI
|
|
├── Story 4.2: Cohort Dashboard UI
|
|
├── Story 4.3: 5-Step Cohort Creation Wizard
|
|
├── Story 4.4: Document Mapping Interface
|
|
├── Story 4.5: TP Signing Interface
|
|
├── Story 4.6: Student Enrollment Monitor
|
|
├── Story 4.7: Sponsor Access Monitor
|
|
├── Story 4.8: TP Review Dashboard (3-panel)
|
|
├── Story 4.9: Cohort Analytics UI
|
|
└── Story 4.10: Excel Export Interface
|
|
Phase 5: Frontend - Student Portal
|
|
├── Story 5.1: Student Invitation Landing
|
|
├── Story 5.2: Document Upload Interface
|
|
├── Story 5.3: Progress Tracking & Save Draft
|
|
├── Story 5.4: Submission Confirmation & Status
|
|
└── Story 5.5: Email Notifications & Reminders
|
|
|
|
Phase 6: Frontend - Sponsor Portal
|
|
├── Story 6.1: Cohort Dashboard & Bulk Signing Interface
|
|
└── Story 6.2: Email Notifications & Reminders
|
|
|
|
Phase 7: Integration & Testing
|
|
├── Story 7.1: End-to-End Workflow Testing
|
|
├── Story 7.2: Mobile Responsiveness Testing
|
|
├── Story 7.3: Performance Testing (50+ students)
|
|
├── Story 7.4: Security Audit & Penetration Testing
|
|
└── Story 7.5: User Acceptance Testing
|
|
|
|
Phase 8: Deployment & Documentation
|
|
├── Story 8.1: Feature Flag Implementation
|
|
├── Story 8.2: Deployment Pipeline Update
|
|
├── Story 8.3: API Documentation
|
|
└── Story 8.4: User Documentation
|
|
```
|
|
|
|
## 5.3 INTEGRATION REQUIREMENTS
|
|
|
|
**Integration Verification Strategy:**
|
|
|
|
Each story must include verification that:
|
|
1. **Existing DocuSeal functionality remains intact** (templates, submissions, submitters)
|
|
2. **New FloDoc features integrate correctly** with existing infrastructure
|
|
3. **Performance impact is within acceptable limits** (<20% increase per NFR1)
|
|
4. **Security is maintained** (no new vulnerabilities introduced)
|
|
5. **Data integrity is preserved** (no corruption or loss)
|
|
|
|
**Critical Integration Points:**
|
|
|
|
1. **Template → Cohort Mapping**:
|
|
- Templates become cohorts
|
|
- Existing template builder must still work
|
|
- New cohort metadata must not break template rendering
|
|
|
|
2. **Submission → Student Mapping**:
|
|
- Submissions represent students in cohorts
|
|
- Existing submission workflows must continue
|
|
- New state management must not conflict with existing states
|
|
|
|
3. **Submitter → Signatory Mapping**:
|
|
- Submitters are participants (TP, Students, Sponsor)
|
|
- Existing submitter logic must adapt to cohort context
|
|
- New email rules must override existing behavior
|
|
|
|
4. **Storage Integration**:
|
|
- Cohort documents use existing Active Storage
|
|
- Bulk downloads must not interfere with existing document access
|
|
- Excel exports must use same storage backend
|
|
|
|
5. **Email System Integration**:
|
|
- Sponsor single-email rule must override DocuSeal's default
|
|
- Student invitations must use existing email infrastructure
|
|
- Cohort notifications must not conflict with existing emails
|
|
|
|
**Rollback Strategy for Each Story:**
|
|
|
|
Every story must include:
|
|
- **Database migration**: Reversible with `down` method
|
|
- **Code changes**: Can be disabled via feature flag
|
|
- **Data preservation**: No deletion of existing data
|
|
- **Testing verification**: Script to confirm rollback success
|
|
|
|
## 5.4 RISK-MITIGATED STORY PRIORITIZATION
|
|
|
|
**Critical Path (High Risk, High Priority):**
|
|
|
|
1. **Story 1.1 (Database)** - Foundation blocker
|
|
2. **Story 1.2 (Models)** - Foundation blocker
|
|
3. **Story 2.2 (TP Signing)** - **HIGHEST RISK** - Must prototype early
|
|
4. **Story 2.3 (Sponsor Email)** - **HIGHEST RISK** - Core requirement
|
|
5. **Story 2.1 (Cohort Service)** - Enables all other stories
|
|
6. **Story 3.1 (Cohort API)** - Enables frontend development
|
|
|
|
**Why This Order?**
|
|
- Database and models are prerequisites
|
|
- TP signing and sponsor email are the two highest-risk items per Section 4.5
|
|
- Early validation prevents wasted effort on dependent stories
|
|
- If these fail, the entire epic needs rethinking
|
|
|
|
**Parallel Workstreams (Low Risk, Independent):**
|
|
|
|
- **Stream A**: Student Portal (Stories 5.x) - Can proceed once API is ready
|
|
- **Stream B**: Excel Export (Story 2.8 + 3.4 + 4.10) - Independent feature
|
|
- **Stream C**: Documentation (Story 8.3 + 8.4) - Can run in parallel
|
|
|
|
## 5.5 ACCEPTANCE CRITERIA FRAMEWORK
|
|
|
|
**All stories must follow this acceptance criteria pattern:**
|
|
|
|
**Functional Criteria:**
|
|
1. Story-specific functionality works as specified
|
|
2. All related FRs/NFRs from Section 2 are satisfied
|
|
3. Edge cases are handled (empty states, errors, validation)
|
|
|
|
**Integration Criteria:**
|
|
1. Existing DocuSeal functionality verified working (see IV1-3 below)
|
|
2. No breaking changes to existing APIs
|
|
3. Database migrations are reversible
|
|
4. Performance impact measured and acceptable
|
|
|
|
**Security Criteria:**
|
|
1. Authorization checks on all new endpoints
|
|
2. Input validation on all user-facing fields
|
|
3. No SQL injection, XSS, or CSRF vulnerabilities
|
|
4. Audit logging for all sensitive operations
|
|
|
|
**Quality Criteria:**
|
|
1. Minimum 80% test coverage for new code
|
|
2. RuboCop/ESLint pass with no new warnings
|
|
3. Design system compliance (per Section 3.1)
|
|
4. Mobile-responsive on all breakpoints
|
|
|
|
**Integration Verification (IV) Template:**
|
|
|
|
Each story must include these IV steps:
|
|
|
|
**IV1: Existing Functionality Verification**
|
|
- "Verify that [existing DocuSeal feature] still works after this change"
|
|
- Example: "Verify that existing template creation still works"
|
|
- Example: "Verify that existing submission workflows complete successfully"
|
|
|
|
**IV2: Integration Point Verification**
|
|
- "Verify that new [feature] integrates correctly with [existing system]"
|
|
- Example: "Verify that new Cohort model links correctly to existing Template model"
|
|
- Example: "Verify that new API endpoints follow existing DocuSeal patterns"
|
|
|
|
**IV3: Performance Impact Verification**
|
|
- "Verify that performance impact is within acceptable limits"
|
|
- Example: "Verify that cohort dashboard loads in <2 seconds with 50 students"
|
|
- Example: "Verify that memory usage does not exceed 20% increase"
|
|
|
|
## 5.6 STORY DEPENDENCIES AND CRITICAL PATH
|
|
|
|
**Dependency Graph:**
|
|
|
|
```
|
|
Story 1.1 (DB Schema) ──┐
|
|
├─→ Story 1.2 (Models) ──┐
|
|
Story 1.3 (Auth) ───────┘ │
|
|
├─→ Story 2.1 (Cohort Service)
|
|
└─→ Story 2.2 (TP Signing - Critical Path)
|
|
└─→ Story 2.3 (Sponsor Email - Critical Path)
|
|
└─→ All subsequent stories...
|
|
```
|
|
|
|
**Critical Path Duration Estimate:**
|
|
- Stories 1.1-1.3: 3-5 days
|
|
- Stories 2.1-2.3: 5-8 days (includes prototyping high-risk items)
|
|
- Stories 2.4-2.8: 5-7 days
|
|
- Stories 3.1-3.4: 3-5 days
|
|
- Stories 4.1-4.10: 8-12 days (TP Portal)
|
|
- Stories 5.1-5.5: 5-7 days (Student Portal)
|
|
- Stories 6.1-6.6: 5-7 days (Sponsor Portal)
|
|
- Stories 7.1-7.5: 5-7 days (Integration & Testing)
|
|
- Stories 8.1-8.4: 3-5 days (Deployment)
|
|
|
|
**Total Estimated Duration**: 42-63 days (8-12 weeks)
|
|
|
|
**Milestones:**
|
|
- **Milestone 1** (Week 2): Foundation Complete (Stories 1.x)
|
|
- **Milestone 2** (Week 4): Backend Complete (Stories 2.x, 3.x)
|
|
- **Milestone 3** (Week 8): All Portals Built (Stories 4.x, 5.x, 6.x)
|
|
- **Milestone 4** (Week 10): Testing Complete (Story 7.x)
|
|
- **Milestone 5** (Week 12): Production Ready (Story 8.x)
|
|
|
|
## 5.7 TECHNICAL DEBT MANAGEMENT
|
|
|
|
**Stories Must Address Existing Technical Debt:**
|
|
|
|
From Section 4.5, we identified:
|
|
1. **No coding standards documentation** → Covered in Section 4.3
|
|
2. **No technical debt analysis** → Covered in Section 4.5
|
|
3. **Partial implementation** (Cohort/Sponsor models referenced but not created) → Stories 1.2 will fix
|
|
|
|
**New Technical Debt Prevention:**
|
|
|
|
Each story must include:
|
|
- **Documentation**: Code comments, API docs, workflow diagrams
|
|
- **Testing**: Unit, integration, and system tests
|
|
- **Refactoring**: Clean code following existing patterns
|
|
- **Review**: Peer review checklist for quality gates
|
|
|
|
**Debt Paydown Stories:**
|
|
|
|
If technical debt is discovered during implementation:
|
|
- **Story 9.1**: Refactor for clarity
|
|
- **Story 9.2**: Add missing tests
|
|
- **Story 9.3**: Update documentation
|
|
- **Story 9.4**: Performance optimization
|
|
|
|
These are tracked separately from main epic but must be completed before epic closure.
|
|
|
|
## 5.8 AGENT COORDINATION REQUIREMENTS
|
|
|
|
**BMAD Agent Roles (Corrected):**
|
|
|
|
Based on the BMAD brownfield workflow, the correct agent roles are:
|
|
|
|
- **Product Manager (PM)**: Creates PRD, prioritizes features, validates business alignment
|
|
- **Scrum Master (SM)**: Creates individual stories from sharded PRD/Architecture docs
|
|
- **Developer (Dev)**: Implements approved stories, writes code and tests
|
|
- **QA/Test Architect**: Reviews implementation, creates test strategies, manages quality gates
|
|
- **Architect (Winston)**: Designs system architecture, validates technical feasibility
|
|
- **Product Owner (PO)**: Validates story alignment, runs master checklists, manages backlog
|
|
|
|
**Story Creation Process (Brownfield Workflow):**
|
|
|
|
1. **SM Agent** creates stories from sharded PRD using `*create` task
|
|
2. **User** reviews and approves story (updates status: Draft → Approved)
|
|
3. **Dev Agent** implements approved story in new clean chat
|
|
4. **QA Agent** reviews implementation, may refactor, appends QA Results
|
|
5. **User** verifies completion, approves for production
|
|
|
|
**Story Handoff Protocol:**
|
|
|
|
Each story must include:
|
|
- **Clear acceptance criteria** (per Section 5.5)
|
|
- **Integration verification steps** (IV1-3)
|
|
- **Design system references** (if UI involved)
|
|
- **API endpoint specifications** (if backend involved)
|
|
- **Test data requirements**
|
|
- **Rollback procedure**
|
|
|
|
**Critical Context Management:**
|
|
|
|
- **ALWAYS use fresh, clean chat sessions** when switching agents
|
|
- **SM → Dev → QA** each in separate conversations
|
|
- **Powerful model for SM story creation** (thinking models preferred)
|
|
- **Dev agent loads**: `devLoadAlwaysFiles` from core-config.yaml
|
|
|
|
**Implementation Order:**
|
|
|
|
Stories must be implemented in the sequence defined in Section 5.2. No jumping ahead, even if later stories seem "easier." This ensures:
|
|
- Foundation is solid before building on it
|
|
- High-risk items are validated early
|
|
- Dependencies are respected
|
|
- Rollback is possible at each stage
|
|
|
|
## 5.9 SUCCESS METRICS
|
|
|
|
**Epic Success Criteria:**
|
|
|
|
1. **Functional**: All 23 FRs and 12 NFRs from Section 2 are met
|
|
2. **Technical**: Zero regression in existing DocuSeal functionality
|
|
3. **Performance**: <20% performance degradation (NFR1)
|
|
4. **Security**: No new vulnerabilities, sponsor portal security audited
|
|
5. **User Experience**: All three portals meet UI consistency requirements (Section 3.3)
|
|
6. **Documentation**: Complete API docs, user guides, and technical documentation
|
|
7. **Deployment**: Successful production deployment with feature flag control
|
|
|
|
**Story Success Criteria:**
|
|
|
|
Each story is successful when:
|
|
- Acceptance criteria are met
|
|
- Integration verification passes
|
|
- Tests pass with >80% coverage
|
|
- Code review approved
|
|
- Design system compliance verified (if UI)
|
|
- Rollback tested and documented
|
|
|
|
## 5.10 NEXT STEPS
|
|
|
|
**Decision Point:**
|
|
|
|
Per your instruction, we're going with **Option D**: Keep Section 5 as-is (structure and strategy are correct), clarify the exact data-copying mechanism in Section 6 when writing detailed stories.
|
|
|
|
**Before Creating Individual Stories:**
|
|
|
|
1. **User Approval**: Confirm this epic structure aligns with your vision ✅ (pending)
|
|
2. **Document Sharding**: PO agent shards `docs/prd.md` into `docs/prd/` folder
|
|
3. **Story Detailing**: SM agent creates detailed stories for Phase 1 from sharded docs
|
|
4. **Technical Spikes**: Dev agent prototypes high-risk items (TP signing, sponsor email)
|
|
5. **Design Validation**: Verify design system assets are complete and accessible
|
|
|
|
**Transition to Epic Details (Section 6):**
|
|
|
|
Section 6 will provide detailed stories for Phase 1 (Foundation):
|
|
- **Story 1.1**: Database Schema Extension
|
|
- **Story 1.2**: Core Models Implementation
|
|
- **Story 1.3**: Authorization Layer Extension
|
|
|
|
**What Section 6 Will Include:**
|
|
- Full user stories (As a... I want... so that...)
|
|
- Detailed acceptance criteria (per Section 5.5 framework)
|
|
- Integration verification steps (IV1-3)
|
|
- Technical implementation notes (including data-copying mechanism clarification)
|
|
- Test requirements and strategies
|
|
- Rollback procedures
|
|
- Risk mitigation details
|
|
|
|
**Critical BMAD Workflow Compliance:**
|
|
|
|
Section 6 stories will follow the brownfield-fullstack workflow:
|
|
1. **SM** creates story from sharded PRD
|
|
2. **User** approves (Draft → Approved)
|
|
3. **Dev** implements in clean chat
|
|
4. **QA** reviews and validates
|
|
5. **User** verifies completion
|
|
|
|
---
|
|
|